loader image

East Port Said Marine

Project Description

East Port Said Marine

2019

Port Said , Egypt

Engineering Authority of the Armed Forces

  • Concrete Works
  • Steel Works
  • Marine Works
  • Piling Works
  • Infra-Structure
  • Breakwaters
  • Soil
  • Improvement
  • Buildings
  • Pavements
  • Utilities

Quay Wall Type : Combi Wall Length 3×500 m Draft20 m Foundation to -68.00 m

Tons Of Steel : 39000 Tons

CuM of Concrete : 80000 CuM
Rocks : 40000 ton
Piles : 40000 LM
Paved Area : 30000 SqM

error: Content is protected !!