The 3 July Marine Base project, completed in 2019 in Matrouh Governorate, Egypt, was developed for the Egyptian Navy. Featuring a 1,000-meter gravity block quay wall with a draught of 17.5 meters, the base utilized 2,000 tons of steel and supports an average daily rock supply of 15,000 tons. Spanning 1,100 hectares with an 80,000 square meter built-up area, the facility enhances naval operations.
Project Description
The 3 July Marine Base serves as a crucial facility for the Egyptian Navy, incorporating extensive concrete, steel, marine, and piling works. The project also involves infrastructure development, breakwaters, soil improvement, and utility installations, ensuring operational efficiency and safety for naval activities.
Client Challenge
The Egyptian Navy required a robust marine base capable of accommodating large naval operations while ensuring structural integrity and compliance with safety regulations. The challenge was to design and construct a facility that meets the specific logistical and operational needs of military maritime activities.