East Port Said Marine

Project Overview

Executive Summary

The East Port Said Marine project, completed in 2019 in Port Said, Egypt, was developed for the Engineering Authority of the Armed Forces. This facility features a combi wall with a total length of 1,500 meters and a draft of 20 meters. The project utilized 39,000 tons of steel, 80,000 cubic meters of concrete, and 40,000 tons of rock, with 40,000 linear meters of piling, covering a paved area of 30,000 square meters.

 

Project Description

East Port Said Marine serves as a strategic maritime facility, incorporating extensive concrete, steel, marine, and piling works. The project includes infrastructure development, breakwaters, soil improvement, and utility installations, ensuring a robust and efficient operational environment.

Client Challenge

The Engineering Authority of the Armed Forces required a marine facility capable of supporting significant naval operations while maintaining structural integrity and safety standards. The challenge was to design and construct a complex infrastructure that meets military logistical needs and operational requirements.

 
 

Photo gallery

error: Content is protected !!