The East Port Said Marine project, completed in 2019 in Port Said, Egypt, was developed for the Engineering Authority of the Armed Forces. This facility features a combi wall with a total length of 1,500 meters and a draft of 20 meters. The project utilized 39,000 tons of steel, 80,000 cubic meters of concrete, and 40,000 tons of rock, with 40,000 linear meters of piling, covering a paved area of 30,000 square meters.
Project Description
East Port Said Marine serves as a strategic maritime facility, incorporating extensive concrete, steel, marine, and piling works. The project includes infrastructure development, breakwaters, soil improvement, and utility installations, ensuring a robust and efficient operational environment.
Client Challenge
The Engineering Authority of the Armed Forces required a marine facility capable of supporting significant naval operations while maintaining structural integrity and safety standards. The challenge was to design and construct a complex infrastructure that meets military logistical needs and operational requirements.